Discussion on “design, construction and tests of an artificial transmission line”, “protection of electrical transmission lines”, “tests of grounded phase protector on the 40,000-volt system of the southern power co.,” “tests of losses on high tension lines.” Schenectady, February 14, 1911. (see proceedings for January and March, 1911)
期刊名称Proceedings of the American Institute of Electrical Engineers