海量图书期刊资源,随时随地畅享阅读乐趣
A Heuristic Algorithm for Project Scheduling with Fuzzy ParametersKhalilzadeh, Mohammad; Shakeri, Hedieh; Gholami, Hadis; Amini, Leila · Procedia Computer Science · 2017
A novel heuristic algorithm with activity back-shift response model for resource-constrained project scheduling problemSheng, Buyun; Wang, Hui; Xiao, Zheng; Zhang, Chenglei; Zhao, Feiyu; Yin, Xiyan · Soft Computing · 2018
Application of Three Meta-Heuristic Algorithms for Maximizing the Net Present Value of a Resource-Constrained Project Scheduling Problem with Respect to Delay PenaltiesRabbani, Masoud; Arjmand, Azadeh; Saffar, Mohammad Mahdi; Jalali, Moeen Sammak · International Journal of Applied Industrial Engineering · 2016
[IEEE 2019 Chinese Control Conference (CCC) - Guangzhou, China (2019.7.27-2019.7.30)] 2019 Chinese Control Conference (CCC) - A Heuristic Algorithm for Solving Resource Constrained Project Scheduling Problem with Transfer Time under Resource BundleCai, Junqi; Peng, Zhihong · 2019
A tabu thresholding algorithm for arc crossing minimization in bipartite graphsVicente Valls; Rafael Martí; Pilar Lino · 1996
A branch and bound algorithm for minimizing the number of crossing arcs in bipartite graphsVicente Valls; Rafael Martí; Pilar Lino · 1996