A heuristic approach for minimizing weighted tardiness and overtime costs in single resource scheduling
Bibo Yang; Joseph Geunes; William J. O'Brien
- 作者Bibo Yang; Joseph Geunes; William J. O'Brien
- 卷第31卷
- 期第8期
- 印刷ISSN0305-0548
- 文件大小583.03KB
- 发表时间2004
- DOI10.1016/s0305-0548(03)00080-7
- 页码1273-1301