Heuristic scheduling of resource‐constrained, multiple‐mode and repetitive projects
Zhang, Hong; Li, Heng; Tam, C. M.
- 期刊名称Construction Management and Economics
- 作者Zhang, Hong; Li, Heng; Tam, C. M.
- 卷第24卷
- 期第2期
- 印刷ISSN0144-6193
- 电子ISSN1466-433X
- 文件大小378.37KB
- 发表时间2006-02
- DOI10.1080/01446190500184311
- 页码159-169